How We Price, UltraBuilders, Telluride, Colorado

How We Price · Every dollar, tracedHow We PriceEvery dollar, traced

Follow a real build ↓

How we price

You Should Know Where Every Dollar Goes

Every invoice on every job goes into one ledger, line by line, and every site visit is photographed. So when you ask where your money went, we can show you: the bill, the trade, and the day it was built.

Below is a real job we are building right now, month by month, from its invoices and site photos. It is a client’s home, so we show where the money went as shares, not dollars.

Follow a real build

Every Month of a Real Build, Dollar by Dollar

A Mountain Village ADU, on site since January. Tap a month to see what was paid for and what it looked like that day.

Invoiced each month, by trade

0%

    Spent by the end of the month

    Where it has gone so far

    21%Framing & structure
    21%Foundation & concrete
    20%Site & excavation
    19%Jobsite & management
    12%Windows & doors
    7%Exterior shell & insulation

    This is a client’s home, so we show shares, not dollars: we don’t publish what our clients spend. Built from every invoice in our cost book for this job, January 2026 to September 2026. Electrical and plumbing are fixed-price contracts billed as the work is inspected, so they are not in these shares yet.

    Budget builder

    Rough Out a New Home

    Where you build moves the number more than anything else. Tap the map, then set the size and finish.

    Where
    3,000 sq ft
    Finish level
    The lot

    Rough range · Mountain Village

    —

    All in, roughly what a finished new home here comes out to per square foot. Your real number comes from your plans and your lot.

    Get a real number →

    Why we lock prices early

    Lumber Does Not Wait for Your Budget

    We buy the same materials every week, so we see a price move the month it happens and order ahead of it.

    2x4 × 8′ stud

    Price per stick from our local lumberyard, 2026

    +16.4%in 3 months
    • 2x6 × 12′ select structuraleach · May → Sep 2026 · bought 5 times$12.76 → $14.23+11.5%
    • 2x6 × 10′ select structuraleach · May → Aug 2026 · bought 5 times$10.70 → $11.86+10.8%
    • ZIP System tape, 3.75″ × 90′per roll · Mar → Sep 2026 · bought 14 times$36.82Steady

    Ask to See the Line Items Behind Your Number

    Send us your plans. Your budget comes back with the local costs it was built from, and every draw shows the invoices and the photos behind it.