Two new accessory dwelling units on the Lake Fork in Ames, and everything around them: we leveled the whole area, built both units, ran electrical out to them, installed heaters and mini-splits, poured a heated concrete walkway, built the hot tub enclosure and finished the landscaping.
On site now
Progress, Week by Week
The latest week first. Pick an earlier week, or use the arrows, to step back through 8 weeks of the build since January 2026. Select a photograph to see it larger.
Day one, and now
Jan 23 to May 19
The first photograph in the build log beside one of the latest, Jan 23, 2026 and May 19, 2026. Drag across the picture to compare.
Jan 23May 19
How owners follow along
Every Visit, Every Photograph, One Private Page
Most of our owners live out of state. Each time we are on site we photograph the work and file it by the day it was taken, on a private build log we send only to the owner. The frames above are a few from that log.